Lai Rui-long leads Ko Chih-en in Kaohsiung mayoral election poll
Lai Rui-long of the Democratic Party holds a significant lead in the Kaohsiung mayoral election according to new polling data released on November 16, 2026. The Era Polling Center reported that Lai Rui-long received 43.9% support, while Ko Chih-en of the Kuomintang received 24.7% support. This represents a 19.2 percentage point gap between the two leading candidates as the election enters its final stages with 12 days remaining until polls close.
Polling data and demographics
The Era Polling Center conducted the survey from November 12 to November 14, 2026. The study utilized stratified random sampling of 1,070 qualified voters in Kaohsiung. The survey carries a margin of error of ±3.0 percentage points at a 95% confidence level. Regarding the likelihood of winning the election, 44.2% of respondents favored Lai Rui-long, while 13.8% favored Ko Chih-en.
Demographic data from the poll shows varying levels of support across different age groups. In the 20-29 age group, Lai Rui-long received 30.1% support and Ko Chih-en received 28.5% support. The highest level of support for Lai Rui-long was recorded among the 30-39 age group, where he received 49.6% support.
Candidate reactions and disputes
The results have drawn different reactions from the competing political camps. Ko Chih-en claimed that her support and likelihood of winning in the Qiaotou District exceeded those of Lai Rui-long by more than double. Furthermore, the camp of Ko Chih-en questioned the sample structure of the Era Polling Center survey. Ko Chih-en stated that the poll sample contains twice as many Democratic Party supporters as Blue or White camp supporters.
Lai Rui-long responded to the polling data by noting that polls are for reference only. The candidate emphasized that the final result of the election depends on the actual votes cast by the electorate. The election involves a field of candidates including Chang Jing of the Judicial Reform Party, Wang Zhao-min, and Hong Fang-long, who are running as independents. The current Mayor of Kaohsiung is Chen Chi-mai.
Alternative street polling results
A separate street poll conducted by the YouTube channel Street Party on November 14, 2026, presented different findings. This poll, hosted by Tsai Yu-chieh, showed a tie between Ko Chih-en and Lai Rui-long, with each candidate receiving 25 votes. The Street Party poll involved 52 respondents, though the total reached 63 when including online viewers. Unlike the Era Polling Center survey, the Street Party poll had no statistical error margin.
The Kaohsiung mayoral election involves an approximate number of 2.25 million eligible voters. As the 12-day countdown to the election continues, candidates continue to campaign across the region to secure the leadership of the city.
Glossary
- Kaohsiung — Kaohsiung, officially Kaohsiung City, is a special municipality located in southern Taiwan. It is the largest city in Taiwan by area and serves as the economic center of southern Taiwan.
- Kuomintang — The Kuomintang (KMT) is a major political party in the Republic of China (Taiwan). It is a centre-right to right-wing party and the largest in the Pan-Blue Coalition.
- White camp — The White camp is a term used to refer to the Taiwan People's Party (TPP). It is a political party that positions itself as a centrist party.
This article was written with AI assistance from multiple news reports and is reviewed by our editors under our editorial principles. Editorial Standards · Tips & Contact
Comments 0