Political Candidates Debate Solar Panel Expansion at Wushan Head Reservoir
Political candidates Ko Wen-je and Xie Long-jie attended campaign events in Xinying on November 19, 2026. Ko Wen-je criticized the government's 2025 non-nuclear energy goal for forcing solar power expansion. Ko Wen-je stated that the government's energy policy should be based on rational, practical, and scientific assessments, not political ideology.
Energy Policy Criticism
Ko Wen-je criticized Chen Ting-fei for making an error regarding the reservoir's solar panels and suggested she simply admit the mistake. Ko Wen-je noted that early contract termination requires compensation considerations. Ko Wen-je stated that the government's 2025 non-nuclear goal forced solar power expansion, leading to installations in inappropriate locations or at unfavorable costs.
The Ministry of Agriculture stated on November 18, 2026 that the Ministry respects local government opinions regarding the solar panels. The Ministry of Agriculture confirmed that water quality monitoring is satisfactory and that the panels are installed according to contract specifications. The Wushan Head Reservoir solar panel installation area is 11.5 hectares. The contract for the Wushan Head Reservoir solar panels expires on April 23, 2032.
Solar Panel Conversion Proposal
Xie Long-jie proposed finding 15 to 20 hectares of land to convert the reservoir solar panels to ground-mounted systems. Xie Long-jie asserted that if the industry rejects the proposal, he will insist on forced demolition. Xie Long-jie countered claims that the solar panels were approved during the Ma administration, stating that the policy was finalized under the Tsai administration.
The solar panel policy began research during the Ma administration in 2015. The Solar Power 2-Year Promotion Plan was approved during the Tsai administration in 2016. The Wushan Head Reservoir solar panel installation area is 11.5 hectares. The contract for the Wushan Head Reservoir solar panels expires on April 23, 2032.
Campaign Context and Debate
The Wushan Head Reservoir solar panel issue is a focal point in the Tainan mayoral election campaign. Ko Wen-je and Xie Long-jie attended campaign events in Xinying on November 19, 2026. Ko Wen-je criticized the government's 2025 non-nuclear energy goal for forcing solar power expansion.
Ko Wen-je stated that the government's energy policy should be based on rational, practical, and scientific assessments, not political ideology. Ko Wen-je criticized Chen Ting-fei for making an error regarding the reservoir's solar panels and suggested she simply admit the mistake. Ko Wen-je noted that early contract termination requires compensation considerations.
Glossary
- Xinying — Xinying is an area where political candidates attended campaign events. It is also a location where the Red Cross Society established an emergency shelter.
This article was written with AI assistance from multiple news reports and is reviewed by our editors under our editorial principles. Editorial Standards · Tips & Contact
Comments 0