TSMC plans NT$30 billion donation to NCKU, but demolition of 1968 Measurement Building raises preservation concerns
Taiwan Semiconductor Manufacturing Company plans to donate over NT$30 billion to National Cheng Kung University to build the NCKU Core, but the project involves demolishing the Measurement Building, the Chemical Building, and the Mathematics Building. The Measurement Building, completed in 1968, is a national-level engineering research center established in 1965. The building previously housed the IBM 1130, the first electronic computer in Southern Taiwan.
Demolition and the Alliance
The Guardians of Tainan Modern Architecture Alliance filed a request with the Tainan City Cultural Affairs Bureau to review the Measurement Building as a historical building. The alliance argues that the project should integrate new construction with historical preservation. The alliance spokesperson, Ms. Lin, stated that the value of modern architecture is often ignored.
The alliance requested that the review committee include architectural professionals. Tainan City Cultural Affairs Bureau Secretary Fu Qing-qi confirmed that the review will follow the Cultural Heritage Act. Lin, stated that the alliance does not want to repeat the fate of the Chemical Building, which was previously listed as no tracking.
University and City Response
NCKU Vice President Li Chun-chang stated that the Mathematics Building will undergo legal cultural property review. The Measurement Building will follow the alliance's historical building proposal.
The Tainan City Cultural Affairs Bureau will form an expert group to evaluate the cultural property value. Lin, stated that the alliance hopes the cultural heritage office will use professional selection to appoint committee members for the review.
The Project Details
The total estimated cost of the project exceeds NT$30 billion. The development plan involves demolishing the Measurement Building, the Chemical Building, and the Mathematics Building. The Measurement Building was established in 1965 as one of five national-level scientific research centers using US-China economic and social development funds.
The building was designed by NCKU early architecture department talent and features a high-ceiling lobby and a diagonal grid-beam auditorium. The building is located in the core of the campus and is surrounded by rain trees. The new building is estimated to have a total floor area of 8000 square ping and 2000 square ping of parking space.
Glossary
- NT$30 billion — The total estimated cost of the project exceeds NT$30 billion. The development plan involves demolishing the Measurement Building, the Chemical Building, and the Mathematics Building.
- Chemical Building — The Chemical Building is one of the buildings that the project involves demolishing. The alliance does not want to repeat the fate of the Chemical Building.
- Mathematics Building — The Mathematics Building is one of the buildings that the project involves demolishing. NCKU Vice President Li Chun-chang stated that the Mathematics Building will undergo legal cultural property review.
- IBM 1130 — The building previously housed the IBM 1130. The IBM 1130 was the first electronic computer in Southern Taiwan.
- Cultural Heritage Act — Tainan City Cultural Affairs Bureau Secretary Fu Qing-qi confirmed that the review will follow the Cultural Heritage Act.
This article was written with AI assistance from multiple news reports and is reviewed by our editors under our editorial principles. Editorial Standards · Tips & Contact
Comments 0